As the buildings infrastructure could not really cope with the warmth displacement of the rental chiller we supplemented fresh air by means of adaptable Ducting connected to our substantial stress rental air handling models which were positioned to the neat air side on the loading bay.No cost cooling chillers drastically minimize Power usage and op